A gas delivery truck drive up to the Pasadena site to drop off gases/LN2 at 7:15 am (local time). A fork lift came later to unload a palletful of gases. The truck finally left the immediate site and parked by the porta-potties awating a tire change. Concurrently with the entry of the gas delivery truck came a fleet of trucks with NovaTech entered the site and worked in/around the containers at the south end of the site. As of this posting (8:45 am local) they are still there.
ALSO - locks on both vehicle gates were improperly "daisy chained"! Campus security threatened to cut our locks if that happens again. They would have this time if I hadn't popped out to let the gas truck in. Let's make sure we do the daisy chain act correctly.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment